What should be done before firing the I 24 boiler for the first time regarding the condensate trap?

The siphonic 75mm condensate trap system requires filling with water before operating the appliance for the first time or after maintenance. When fitting the flue turret, the installer must ensure the condense trap/siphon is filled with water before proceeding. Failure to do so could affect correct operation of the condensate system. (Page 22)

From the official Ideal Boilers I 24 manual, page 22

Have a follow-up question?

Answers from the official manual.

Common questions