What steps are required when installing and testing a TE2 starter with a motor smaller than specified?

When testing smaller loads, configure the system to disable Phase Loss Protection according to section 5.6.8.a guidelines.

From the official Toshiba Satellite L645 S4032 HD Intel Core I3 350m Laptop Specifications And Datasheet manual, page 24

Have a follow-up question?

Answers from the official manual.

Common questions